Operations · 4 min read · 23 October 2026 · By Richard Lord, Founder, ParkSphere
Switching holiday park software over the winter: a realistic timeline
A week-by-week plan for switching holiday park software in the closed season, so you start the new season on a system your team already trusts.
Want a tailored number for your park?
Get a pricing estimate instantly, then decide if a walkthrough makes sense.
The best time to change how your park runs is when the park is quiet. For most UK holiday and caravan parks that means the closed season or the low-occupancy weeks between November and February. The worst time is March, when owners are arriving, the phone is ringing and the first bookings of the year need to go into a system you trust.
That gives you a window of a few months. It is enough time to switch software properly, but only if you treat it as a project with a start date, an end date and a short list of decisions — not something you squeeze in around everything else.
This is a practical timeline for doing it over one winter.
Before you start: decide what "done" means
A switch goes wrong when nobody agreed what it was for. Before you look at any system, write down three or four things the new set-up must do on day one of the season. For example:
- Take online bookings for pitches, statics and lodges without double-booking
- Show the office today's arrivals and departures on one screen
- Let owners see their account and raise maintenance requests without phoning
- Give the maintenance team a job list they actually use
Everything else — reports, integrations, the nice-to-haves — can come later. A short list keeps the project small enough to finish.
Weeks 1–2: get your data out
Whatever you use today, the information you need to keep is usually spread across a booking system, a spreadsheet or two, an accounts package and people's heads. Start by listing it:
- Units: every pitch, static, lodge and glamping unit, with its type, size and any restrictions (hook-up, hardstanding, pets)
- Bookings already taken for next season, with deposits paid
- Owners: contact details, which unit, licence or agreement dates, and anything they owe
- Rates and seasons as you actually charge them, not as the old system was set up years ago
- Regular suppliers and jobs: gas, meter readings, seasonal maintenance
Ask your current provider how to export each of these and in what format. Some will give you a spreadsheet; some will need a request. Do this early, because it is the step most likely to take longer than you expect.
Weeks 3–4: set up the park, not the paperwork
Build the park in the new system the way it is on the ground: zones, pitches, units and the map. If the system has a park map, spend time on it — it is what reception will look at all season.
Then set up your seasons and rates. This is a good moment to tidy them. Many parks carry years of special rates that nobody uses. If a rate has not been booked in two seasons, leave it out and add it back if someone asks.
Weeks 5–6: bring the bookings and owners across
Move forward bookings and owner records next. Check a sample by hand: pick ten bookings and ten owners at random and compare them with the old system. If those match, the import is probably right. If two or three don't, stop and find out why before going further.
Deposits and balances deserve the most care. Agree with your accountant how opening balances will be recorded, so that the two systems agree on the day you switch.
Weeks 7–8: train the people who will use it
Train in short sessions, by role, using your own park's data:
- Reception: check-in, check-out, taking a booking, changing a booking
- Maintenance: seeing the job list on a phone, updating a job, adding a photo
- Managers: the day view, the booking chart and the few reports you look at every week
Let staff practise on real-looking bookings. People learn a system by using it on a slow afternoon, not from a manual.
Weeks 9–10: run both, then switch off the old one
For a short period, take new bookings in the new system only, and use the old one as read-only reference. Set a firm date to stop using it. Running two live systems for longer than a couple of weeks doubles the work and guarantees the two will disagree.
What to ask any provider before you commit
- How do I get my data out again if I leave? Can I export it myself?
- Who moves my existing bookings and owner records — you or me?
- What happens if something goes wrong in the first weekend of the season? Who do I call?
- Is the contract monthly or annual, and what is the notice period?
- Where is my guests' and owners' personal data stored, and who can see it? (Under UK GDPR you remain responsible for it.)
If the answers are vague, treat that as the answer.
The short version
Switching over the winter works when you keep the scope small, get the data out early, check a sample by hand, train by role and set a hard stop for the old system. Leave it until February and you will be learning a new system with guests in reception.
If you would like to see how this looks in ParkSphere — the park map, the day view, owner accounts and the maintenance app — you can book a walkthrough. It is a conversation about your park, not a sales pitch.
See ParkSphere on your park's real layout.
30-minute demo. No slides. We'll reply within one working day.
More articles
How to choose holiday park software in 2026 (without getting locked in)
A practical, vendor-neutral guide to evaluating holiday park management platforms. The 11 questions that matter, the 4 red flags to walk away from, and how to think about total cost of ownership.
Read article →Online booking engine vs channel manager: which does your park actually need?
Park owners often confuse the two — and end up either paying for both or for neither. A clear breakdown of what each does, when you need each, and when an all-in-one is the right call.
Read article →What guests actually want from a holiday park app in 2026
What guests actually praise in reviews when a park has a good app, the features they ignore, and the ones that reliably trigger complaints when they're missing.
Read article →